看词语>英语词典>cable length翻译和用法

cable length

英 [ˈkeɪbl leŋθ]

美 [ˈkeɪbl leŋθ]

链(英国608英尺,美国720英尺);电缆长度;线长;电线长度

英英释义

noun

双语例句

  • The results of simulation and engineering applications indicate that the wavelet de-noising processing with the decomposition level determined by the adaptive selection algorithm can effectively filter out the noise from the TDR signal and then improve the measuring accuracy of the TDR cable length measurement system.
    仿真结果和工程应用结果表明,采用该方法确定的小波分解层数对被测信号进行消噪处理,可以有效的滤除信号中的噪声,提高时域反射电缆测长系统的测量精度。
  • According to the mechanic characteristics of this system, the bearing cable, the stress-free cable length of carry cable and the meticulous algorithm of suspension force of each span are given, and the influence of gentle cable elongation on its dead weight is presented.
    文中根据该系统的力学特点,给出了承重索、轨索的无应力索长和各跨吊杆力的精细算法,并计入了柔索伸长对其自重集度的影响。
  • The propagation process of pulse wave in the cable and influence of cable length on overvoltage and wavefront time of winding are discussed in this paper.
    讨论了脉冲波在电缆中的传播过程以及电缆长度对线圈端的过电压和脉冲上升时间的影响。
  • The basic theory of control method of unstressed cable length is illustrated. And this control method is employed for adjustment hanger force of self-anchored suspension bridge, order to conform with require of design.
    阐述了无应力索长控制法的基本理论,并采用该控制方法调整自锚式悬索桥吊杆的内力值,使之符合设计要求。
  • And then the effect of the change of cable length and span and the redistribution of dead load due to deformation on cable curve are analyzed.
    分析了索长变化、跨度变化及主缆变形引起的恒载重分布对主缆线形的影响。
  • Under the conditions of given initial mid-span deflection, the cable length increment and load increment were obtained by means of the mid-span deflection increment.
    在给定初始跨中挠度的条件下,利用跨中挠度增量值求得索长增量值与载荷增量值;
  • The calculation for construction control of the bridge is made with 3D Bridge program and the unstressed cable length method is used to control the final target status of the bridge in the spacial program.
    施工控制计算采用3DBridge进行,并在空间程序上利用无应力索长法控制斜拉桥最终目标状态。
  • Simulative calculation of cable pre-tension and calculation of unstressed cable length in flexible pre-stress structure
    预应力柔性结构中拉索预张力模拟的迭代算法和无应力索长的计算
  • Analysis on Calculation Precision the Cable Length
    悬索索长计算精度分析
  • The iterative calculation method of unstressed cable length has been successfully applied to pre-stress steel grid shell works of Jiangning Stadium.
    该迭代算法的无应力索长的计算方法在江宁体育场预应力钢网壳工程中已成功应用。